尼日利亚拉伊铁路项目Lagos站(含)至Ibadan站(含)线路为双线内燃铁路,正线全长156.08km采用全自动闭塞,Apapa港口支线工程长约6.513km采用半自动闭塞。
正线工程全线新设Lagos、Agege、Agbado、Kajola、Papalanto、Abeokuta、Olodo、Omi-adio、Ibadan等10个车站。支线工程Apapa支线由港湾站、港口站(一站两场)构成。该项目由我公司完成了通信及信号产品的供货,包括信号电源系统、计轴设备、通信电源系统、转辙机、继电器、信号组合柜、站间安全信息传输设备、调度中心大屏显示系统、电源及环境监测系统等多种设备。
The Lagos station (inclusive) to Ibadan station (inclusive) of the Nigerian Railway Project is a two-line internal combustion railway. The full length of the main line is 156.08km with automatic occlusion, and the Apapa port spur line is about 6.513km long with semi-automatic occlusion. Ten stations including Lagos, Agege, Agbado, Kajola, Papalanto, Abeokuta, Olodo, Omi-adio and Ibadan were newly established on the main line. The Apapa branch line consists of the harbor station and the port station (one station with two yards). Our company supplies the telecommunication and signal equipment for the project , including signal power system, axle counting equipment, communication power system, switch machines, relays, signal cabinets, station safety information transmission equipment, and large screen displays for dispatch center, power supplies and environmental monitoring systems.